Sunday, April 26, 2009
Building and Rebuilding v.01
After struggling with the idea of how to take into form my thesis I decided to build a thing, what I called the "WALL". The following posts and pics are snapshots about the process of how to build this environment.
Sunday, January 18, 2009
New Precedents: searching my own language
This list gathers works that touch the idea of collective construction.
John Maeda:
FontPark Tree
This work has a correlation with my idea of collective construction.
http://www.maedastudio.com/2001/moritree/index.php?category=all&next=1995/mdn1&prev=2004/samsung&this=moritree
Zach Lieberman:
Gesture Machines/ Mix Master
Even though this is not an audiovisual project it has the idea of mixing different inputs and creating a mean interpretation of them.
http://www.theremediproject.com/projects/issue12/systemisgesture/
Golan Levin:
Ghost Pole Propagator
this project has similarities with mine in the sense of creating not only a collective construction but also the sense of leaving a trace for a while.
http://www.flong.com/projects/gpp/
John Maeda:
FontPark Tree
This work has a correlation with my idea of collective construction.
http://www.maedastudio.com/2001/moritree/index.php?category=all&next=1995/mdn1&prev=2004/samsung&this=moritree
Zach Lieberman:
Gesture Machines/ Mix Master
Even though this is not an audiovisual project it has the idea of mixing different inputs and creating a mean interpretation of them.
http://www.theremediproject.com/projects/issue12/systemisgesture/
Golan Levin:
Ghost Pole Propagator
this project has similarities with mine in the sense of creating not only a collective construction but also the sense of leaving a trace for a while.
http://www.flong.com/projects/gpp/
Tuesday, December 2, 2008
Site Specific notes
List of requirements for my site specific:
este es un monumento para quien quiere extender su permanencia en ese lugar
or TIME SPECIFIC?
"a site implies an audience"
Public Space:
Parks:
Central Park
Public Libraries:
NY public Library
archive
Subway Station:
Monuments:
note: most of the monuments have to deal with wars, heroes, or people who are dead.
statue of liberty
Bus Stop:
bus shelter
Airport:
La guardia
JFK
Train Station:
Museums: are places of dead things, things of the past
but they archive of the past
Museo del Barrio
Galleries:
Chelsea
este es un monumento para quien quiere extender su permanencia en ese lugar
or TIME SPECIFIC?
"a site implies an audience"
Public Space:
Parks:
Central Park
Public Libraries:
NY public Library
archive
Subway Station:
Monuments:
note: most of the monuments have to deal with wars, heroes, or people who are dead.
statue of liberty
Bus Stop:
bus shelter
Airport:
La guardia
JFK
Train Station:
Museums: are places of dead things, things of the past
but they archive of the past
Museo del Barrio
Galleries:
Chelsea
Schedule to the next of the semester
TUESDAY 2ND
1. Script for the simulation
2. Plan of schedule
3. Break down of the options of site specific
TUESDAT 2ND 9PM UNTIL THURSDAY 4TH 3PM
1. Software design and develop, graphic options, as navigation system of the software
2. Quick research of hardware options
THURSDAY 4TH 3PM UNTIL MONDAY 8TH 6PM
1. Shooting and Editing. Not be done at this date but will have the outline of the movie
2. Work on my final presentation
TUESDAY 9TH 10AM UNTIL THURSDAY 11TH 6PM
1. Finishing the video editing of the simulation.
2. Work on my final presentation
THURSDAY 11TH 9PM UNTIL SATURDAY 13TH 6PM
1. Rehears my presentation
2. work on details
SUNDAY 14 9am to 6pm
FINAL PRESENTATION
1. Script for the simulation
2. Plan of schedule
3. Break down of the options of site specific
TUESDAT 2ND 9PM UNTIL THURSDAY 4TH 3PM
1. Software design and develop, graphic options, as navigation system of the software
2. Quick research of hardware options
THURSDAY 4TH 3PM UNTIL MONDAY 8TH 6PM
1. Shooting and Editing. Not be done at this date but will have the outline of the movie
2. Work on my final presentation
TUESDAY 9TH 10AM UNTIL THURSDAY 11TH 6PM
1. Finishing the video editing of the simulation.
2. Work on my final presentation
THURSDAY 11TH 9PM UNTIL SATURDAY 13TH 6PM
1. Rehears my presentation
2. work on details
SUNDAY 14 9am to 6pm
FINAL PRESENTATION
Next Steps for the following two weeks
1. Usability
test the last prototype in a public space with real people
2. Location
find a site specific location
list the requirements for your ideal place
list for my site specific:
3. Possible Implementation
software design
hardware design
design of the physical structure
Options for the display: LCD screen, wacom tablet, smart surface
4. The System
timespan
navigation
details of the "look and feel"
5. Flowchart of the Process
6. Final Deriverable
video simulation: user's scenario - Script
test the last prototype in a public space with real people
2. Location
find a site specific location
list the requirements for your ideal place
list for my site specific:
3. Possible Implementation
software design
hardware design
design of the physical structure
Options for the display: LCD screen, wacom tablet, smart surface
4. The System
timespan
navigation
details of the "look and feel"
5. Flowchart of the Process
6. Final Deriverable
video simulation: user's scenario - Script
Subscribe to:
Posts (Atom)
About Me
- Eduardo Menendez
- NY
- I am a NY based Artist-Designer who is pursuing a MFA in Design & Technology degree at Parsons the New School For Design. This is my thesis research blog. Any comment will be appreciated.